Case

Stationsparking Kortrijk

Date

2019 - 2023

Architect

Eurostation

Client

Stad Kortrijk

Size

32.000 m²

Location

Kortrijk

General

The station area of Kortrijk is undergoing a profound transformation. With the Kortrijk Station Parking, new tunnels, and a redesigned public space, the focus shifts toward sustainable mobility, vulnerable road users, and improved public transport flow. A crucial link in this whole is the underground Kortrijk Station Parking, complemented by tunnels for cars, buses, and cyclists beneath the railway infrastructure. The many organic shapes in the design and the chosen construction method pose a particular challenge for our structural engineers.

For the realization of the Kortrijk Station Parking, several parties are collaborating, including NMBS, the City of Kortrijk, the Agency for Roads & Traffic, and Parko. TVH-Eiffage Vlaanderen (Antwerpse Bouwwerken - Vuylsteke) is responsible for the construction of the parking, while Besix is responsible for the car tunnel. BM Engineering Group translates the design plans of the building owner into execution plans for the construction phase, with particular attention to columns, walls, floor slabs, and diaphragm walls.

 

Stross method for the Kortrijk Station Parking

The Kortrijk Station Parking is being built using the stross method, a form of top-down construction. Instead of first excavating a complete construction pit, after placing the diaphragm walls, foundation piles and steel columns are installed. Subsequently, the roof slab is constructed at ground level. Only then is the soil underneath excavated step by step and the underground levels finished one by one.

This approach offers several advantages. The concrete slabs function during execution as temporary bracing for the diaphragm walls, making additional ground anchors unnecessary. Moreover, the impact on the surroundings remains limited, which is essential in a busy station environment such as that of Kortrijk.

 

Development of complex reinforcement in 3D

For the Kortrijk Station Parking, BM Engineering Group develops the reinforcement entirely in 3D. Due to the many level differences in the roof slab and the complex geometry of the design, this approach provides clear insight into the structure. Potential conflicts between reinforcement bars are detected and resolved during the design process, making execution on site more efficient.

BM Engineering Group also delivers the execution plans for the extension of the car tunnel toward the former cloverleaf roundabout De Appel. Due to the curved shape of the tunnel alignment, the design contains few straight lines, resulting in a large variety of reinforcement elements. With roof slabs up to 1.20 meters thick and diaphragm walls of considerable dimensions, a thorough 3D development is indispensable. The works are carried out in phases to guarantee the accessibility of the city center, with the formwork and reinforcement plans closely aligned with this execution strategy.

 

Construction partners:

• NMBS – Stations Directorate – building owner
• NMBS – Division Study – design
• THV Eiffage Vlaanderen – main contractor parking
• Besix – main contractor tunnel
• BM Engineering Group – execution plans for the structure and the diaphragm walls