Case

Bruggen Albertkanaal Cluster 1

Date

2017 - 2019

Architect

Via T Albert

Client

VVZRL TIJDELIJKE MAATSCHAP VIA T ALBERT BOUW

Location

Eigenbilzen, Zutendaal, Stokrooie, Kwaadmechelen Zwartenhoek, Eindhout, Geel-Stelen en Herentals-Lier

General

To get more freight traffic off the roads, the Flemish government is investing through public-private partnerships in strengthening the infrastructure for inland waterway transport. De Vlaamse Waterweg has appointed Via T Albert to rebuild seven bridges over the Albert Canal in a first project cluster. BM Engineering Group is responsible for the quay walls, abutments, and bridge piers.

 

Higher bridges for inland waterway transport

Because the canal is not deep enough and the bridges are not high enough, the clearance height of the bridges in Eigenbilzen, Zutendaal, Stokrooie, Kwaadmechelen Zwartenhoek, Eindhout, Geel-Stelen, and Herentals-Lier will be raised to a minimum of 9.10 meters. This increases the efficiency of inland waterway transport in general and provides a boost for container shipping. Due in part to the further development of the terminals on the Left Bank in Antwerp, significant growth in freight transport is expected by 2030. Therefore, alternatives to truck transport are more than welcome.

 

Via T Albert takes the lead

Via T Albert is a collaboration between Franki Construct, Kumpen, Hye, Aswebo, and Aelterman in a company specifically established for this project. The consortium is responsible for the design, construction, and financing, as well as the maintenance of the bridges for the first 30 years. The contract between the Flemish government and Via T Albert was signed on August 31, 2017. Barely 3 months later, the first sheet pile was already driven into the ground. The 7 new bridges must be completed within 3 years.

 

Our role in the project

BM Engineering Group, as a subcontractor of Via T Albert, handles the study, design, and supervision of a number of sub-projects. The quay walls are being renewed at every location where a bridge is being built, over a combined length of 3 kilometers. For each bridge, BM also carries out detailed design studies of the abutments – with embankments and retaining structures for the approach ramps – and of the bridge piers. Even though the 7 bridges are being built simultaneously, each bridge is different. Because the positioning of the bridge and the presence of underground structures differ at each location, each bridge must be considered as a separate design. With 7 bridges within a timeframe of 3 years, this is once again a major structural engineering project for the Civil Engineering department.

 

Construction partners:

* De Vlaamse Waterweg – client / building owner
* Via T Albert – main contractor
* BM Engineering Group – Civil engineering