Case

Zoutman parking

Date

2017-2019

Architect

CAAN Architecten

Client

Zoutman nv

Location

Roeselare

General

For Zoutman, a new staff parking area was constructed at the office building in Roeselare. The design emphasized sustainable water management: rainwater is not drained away but buffered and infiltrated locally as much as possible. For this reason, part of the parking area was constructed using permeable concrete pavers, which allow rainwater to seep directly through the surface. Beneath the paving lies an underground buffer system with infiltration crates, which temporarily captures the water and gradually allows it to infiltrate into the soil. Drainage pipes and an overflow pit ensure that peak rainfall can be safely discharged into the existing sewer system. This relieves the existing sewer system and keeps the groundwater replenished.

The project also included the widening of the existing entrance, new lighting, and retaining walls. The works were carried out in two phases: first the entrance and the lower part of the parking area, then the upper part together with the construction of the office building. This ensured the site remained accessible during the works.

 

Our role in the project

BM Engineering Group was responsible for the entire process, from design to delivery. We prepared the preliminary design and the final design and developed the tender dossier. We then managed the tender process and guided the contract award to the contractor. We also supervised the works through to provisional acceptance.

 

Construction partners

* Zoutman - client
* Verwebo - main contractor
* BM Engineering Group - civil engineering