Wegbrug Ooigem-Desselgem
2020 - 2021
De Vlaamse Waterweg
99m
Ooigem
General
The Ooigem-Desselgem road bridge is part of Seine-Scheldt Flanders. This is a large-scale inland waterway project by De Vlaamse Waterweg nv, with support from the European Union. The project aims to develop inland shipping into a full-fledged alternative for freight transport by road. This results in less traffic congestion, more safety, and a cleaner environment.
To achieve this, the European waterways must be made suitable for vessels with a larger loading capacity, so that they can navigate smoothly between the Seine and the Scheldt. Flanders plays a key role in this: it is tasked with completing the missing link in the European waterway network. For this reason, the Lys river is being adapted for class Vb vessels, which are up to 190 meters long and 11.4 meters wide.
In addition, cargo ships carrying three layers of containers must be able to pass under bridges without any problems. This requires a clearance height of 7 meters. The current bridge between Ooigem and Desselgem has a clearance height of only 5.6 meters and is therefore being completely replaced.
Our role
BM Engineering Group serves as the Civil Engineering consultancy for contractor Artes Depret and is responsible for the execution and reinforcement plans of the bridge abutments of the Ooigem-Desselgem road bridge.