Case

Enso District Hotel

Date

2022 - 2023

Architect

BV Scratch

Client

NV Sten

Size

2.322 m²

Location

Knokke

The Enso District Hotel is situated on the 1st and 2nd floors of the Duinenwater development and forms part of a high-rise building. BM Engineering Group is responsible for the Building Services.

The technical installations are not connected to those of the high-rise building, meaning that the Enso District Hotel operates completely autonomously. The basement houses general facilities such as the kitchen, utility rooms and storage areas. The underground car park also features an access point for hotel guests who park their cars underground.

On the ground floor, there is a restaurant and reception area. On the first and second floors, there are a total of 37 rooms. The rooms are luxuriously furnished and feature a tablet used to control the lighting throughout the room, contact reception and place orders via room service. Each room has a spacious bathroom, some of which are equipped with a wellness area or a freestanding bath. Comfort in the rooms of the Enso District Hotel is guaranteed by a fan coil unit that provides both cooling and heating. This is also controlled via the tablet.

The associated air-to-water heat pumps are installed on the roof of the high-rise building. Domestic hot water for the Enso District Hotel is produced by two gas boilers located in the plant room on the roof. Ventilation is provided by an air-handling unit with a heat recovery wheel, also installed on the roof.